NAV CAN Remote Air Traffic Control

Kingston Airport
Size: 7,104 sq. ft. | 1 Story
Client: Navigation Canada
Project Type: Commercial Aviation
Modular Components: 4 volumetric frames, 6 wall panels, 4 roof modules
Factory Fabrication: 6 weeks
Site Installation: 4 days (+ balance of site connections and finishes)
Project Scope: Modular design, fabrication, delivery, and installation
This first-of-its-kind modular air traffic control centre in Kingston was delivered in close collaboration with the client, general contractor, and NAV CAN operational team to meet highly specialized aviation requirements. By adapting the original design to align with budget parameters and prefabricating a coordinated system of volumetric modules, wall panels, and roof assemblies, We provided flexible training, technical, and office spaces while maintaining stringent performance and 24/7 operational standards. Off-site fabrication ensured tight quality control and minimized disruption to the active airport environment, allowing installation to be completed in just days.



